Urban Utilities is committed to excellence in water and wastewater services that meet the evolving needs of our customers and enhance the liveability of our communities.

What is happening?

Urban Utilities in conjunction with our delivery partner, Utilitia and Stantec will soon begin to obtain samples from our wastewater network from multiple locations around Brisbane.

These locations include:

  • North Quay
  • CBD
  • Fortitude Valley
  • New Farm
  • Bowen Hills
  • Hamilton
  • St Lucia
  • Toowong
  • Auchenflower
  • West End
  • South Brisbane
Why is this happening? 

The sampling program is a key activity to identify odour hotspots and investigate solutions.

When is this happening?

A rehearsal run will take place on 7 October 2023 from 7pm to 1:30am 8 October 2023 to identify any adjustments that need to be made. 

Sampling is scheduled to commence from 17 October 2023, and will take place over two week period. The sampling will be taken at different times during the works dependant on the type of sampling required:

  • Liquid Grab Sampling will occur intermittently over a 24 hour period.
  • Trade Waste Sampling will occur over a 24 hour period at select locations.
  • Gas grab sampling will be taken over a 14 day period.

On 24 October 2023 to 25 October 2023 crews will be changing the batteries in the gas sampling equipment.

On 1 November 2023 instrument retrieval will occur.

 

 We thank you for your patience and understanding whilst we complete this essential work.
 

We will work closely with our partners to minimise the impact to residents and businesses in these areas. Communication activities will take place before work starts.

Project Benefits

Accurately identifying odour hotspots will allow us to investigate targeted solutions for odour mitigation. 

What to expect during the sampling works?
  • Work hours - Sampling will be carried out at intermittent times during the two-week period.
  • Night works - Where our works will have a major impact on traffic, night works will be required. Work hours will be from 5am 17 October through to 18 October 2023.
  • Temporary  road closures - Temporary lane closures will be required around work sites. 
  • Pedestrian and vehicle access - Local access to the maintenance hole sites around Brisbane will be maintained whilst the samples are being obtained however, car parking may be temporarily limited at various times during the works.
  • Safety - Traffic management will be in place to look after the safety of our crews, road users and pedestrians. Please take care when travelling through the work areas and observe all signposting, speed limits and any directions given by traffic controllers.
  • Noise and dust - During sampling activities there will be some noise from vehicle movements and crew activity. 
  • Restoration -As we are accessing the site through the maintenance holes no restoration works will be required
  • Temporary water outages -There will be no water outages during these works.

Please travel through these areas with care and observe all signage, speed limits and any direction given by traffic controllers.

 

 

 

 

 

 

Map Sampling locations

Communication activities will take place before work starts.

For more information, get in touch by:

Phone:13 26 57 8am - 5pm Monday to Friday

Email: Community.Feedback@urbanutilities.com.au

Faults and emergencies on 13 23 64 (24/7)